Containerized LNG could be the latest product to be manufactured at the Skeena Industrial Development Park in Terrace. (Taisheng International Investment Services photo)

Chinese firm proposes LNG processing plant near Terrace

Project to be located within the Skeena Industrial Development Park near airport

A Chinese distributor of liquefied natural gas wants to build a processing facility near Terrace, next to the regional airport.

Top Speed Energy sent a letter to area residents on Oct. 16, seeking feedback on a facility that could process 150,000 tonnes of LNG per year – about 0.6 per cent of what’s manufactured at LNG Canada’s multi-billion-dollar facility in nearby Kitimat.

The project is small enough for the company to bypass federal and provincial environmental assessments, the letter said. It will instead submit a permit application to the BC Oil and Gas Commission and any required applications to the City of Terrace.

The facility would receive natural gas from a nearby pipeline, and then transport the finished product by truck to a terminal in Prince Rupert and on to domestic and international markets.

The number of containers is expected to be handled within the terminal’s existing capacity, and “is not a driver for terminal expansion,” said the letter, signed by Clark M. Roberts, the CEO of the firm’s Canadian arm, based in Burnaby.

The 1,187-acre plot of land, in a business park next to the Northwest Regional Airport, was bought in 2014 by Taisheng International Investment Services, which later signed a development agreement with the city. No additional roads will be built.

Residents and organizations have until Nov. 6 to send in written feedback. They can also request a meeting with the company.

This isn’t TSE’s first jump into LNG exports from B.C. to Asian markets. FortisBC, a utility company operating a liquefaction facility on the Fraser River near Vancouver, signed Canada’s first long-term supply agreement to produce LNG for export to China with TSE in July.

Under the two-year agreement, 53,000 tonnes of LNG will be shipped from the Tilbury facility in B.C. to China by summer 2021.

READ MORE: FortisBC eyes expansions after inking deal to send LNG by container to China

READ MORE: Pacific Northern Gas moves to reinstate full capacity and expand pipeline

TSE LNG Facility Letter by Brittany Gervais on Scribd

Like us on Facebook and follow us on Twitter

Just Posted

Snowfall warning for Kootenay and Paulson passes

Up to 30 cm expected in mountain passes Saturday and Sunday.

RCMP report

Some of the more interesting callouts for Columbia Valley RCMP November 4-10th

Moose tests positive for Chronic Wasting Disease in northwest Montana

This is the first time the disease has been detected in the species in Montana

Watching our water footprint

Lake Windermere Ambassadors coordinator walks through water footprint

Films celebrate passionate people and places

Get your tickets now for upcoming Wild & Scenic Film Festival

Bye bye Bei Bei: Giant panda born in U.S. zoo heads to China

Panda heads back to China as part of cooperative breeding program

Little progress in preventing sudden infant deaths since last report: BC Coroner

Coroners panel studied 141 sleep-related sudden infant deaths between 2013 and 2018

B.C.’s ‘Dr. Frankenstein of guns’ back in jail yet again for trafficking in Glock parts

Bradley Michael Friesen has parole revoked for allegedly importing gun parts yet again

B.C. woman suing after laser hair removal leaves her with ‘severe’ burns, scarring

Nadeau felt ‘far more pain’ than usual during the treatment

$2.9 million judgment in B.C. blueberry farm sabotage lawsuit

The new owners saw most of their farm ruined just as they took possession

B.C. to more than double sales tax on vaping products

Tax up from 7 to 20 per cent, tobacco tax up two cents

29 B.C. students in Hong Kong amid tense protests, university siege

Eight UVic and 21 UBC students still in Hong Kong

‘Midget’ no more: Sweeping division name changes coming to minor hockey in Canada

Alpha-numeric division names will be used for the 2020-2021 season and beyond

Ottawa urges CN and union to continue talks as 3,200 workers go on strike

The rail workers began their strike after failing to reach a deal by a midnight deadline

Most Read