Illustration shows new Pattullo Bridge will have four vehicle lanes with a divider and separate lanes for pedestrians and cyclists. (Ministry of Transportation)

Contractors picked for B.C.’s Pattullo Bridge replacement

Acciona, Aecon to build union-only four-lane Fraser crossing

The B.C. government has picked a partnership of construction giants Acciona and Aecon to build the replacement for the aging Pattullo Bridge between Surrey and New Westminster.

Estimated at a cost of $1.377 billion, the new bridge and connecting roads are scheduled to be completed in 2023. Built north of the existing 83-year-old structure, the new bridge will still have only four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.

In a year-end interview with Black Press, Premier John Horgan said the Pattullo crossing is a higher priority than the congested George Massey Tunnel because the Pattullo is “falling into the river.” It is one of three projects designated by the NDP government’s “community benefits agreement” that requires construction workers to be a member of one of 19 mostly U.S.-based unions.

Transportation Minister Claire Trevena has acknowledged that the union-only deal would add about seven per cent to the cost of the project, or nearly $100 million in the case of the Pattullo.

Trevena and Horgan say the new public construction rules will result in more local hiring and use of apprentices. The Independent Contractors and Business Association cites statistics from the government’s Industry Training Authority showing three out of four apprentices are sponsored by open-shop companies, not building trades unions that run their own training facilities.

Acciona is a Spain-based multinational that is also a major contractor on the Site C dam in northern B.C. and the Walterdale Bridge in Edmonton. Its original bid was with a group including SNC Lavalin, but the Quebec-based company dropped out and the successful consortium with Aecon is called Fraser Crossing Partners.

RELATED: Pattullo Bridge seismic work scrapped as ‘cost-prohibitive’

RELATED: OUTLOOK 2020: John Horgan on forestry and union labour

RELATED: Cost jumps 35% for union-only Highway 1 widening job

Aecon Group is a long-established Ontario-based company that is building the Annacis Island wastewater treatment plant in Delta and has contracts for the Coastal GasLink pipeline across northern B.C., as well as refurbishing the John Hart Dam on Vancouver Island and the Darlingon nuclear plant in Ontario.

The Canadian government intervened in 2018 to block the sale of Aecon to China’s CCCI International Holding. Innovation Minister Navdeep Bains said at the time the decision was the result of a “multi-step national security review process.”

In a statement from its Chicago office Friday, Acciona said it and Aecon have been selected as the preferred proponent “to design, construct, and partially finance during construction” the new Pattullo Bridge.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Just Posted

Local company’s sweet burn fades

Local owners Dave and Kathy Sutherland are moving on, leaving stockpiles of their jelly dwindling.

Video invites visitors back to valley

Chamber video says: “Hey, hey! Come back and play, play.”

Invermere deer ‘hoofs’ woman and dog

Aggressive deer incidents increase this year, as woman and dog left bruised and injured

School District 6 nominated Summit Youth Hub for award

Hub nominated for a B.C Principals’ and Vice Principals’ Association (BCPVPA) Partnership Award

Islanders want BC Ferries to follow order that lets residents board before tourists

For ferry-dependent communities, ferries are often the sole practical lifeline to work, school or medical appointments.

Beverly Hills 90210 star’s family selling Vancouver Island Beach Resort

You can own Jason Priestley’s Terrace Beach Resort in Ucluelet for less than $5 million

Genetic detectives begin work to trace spread of COVID-19 in Canada

The kinds of genetic technology being used for this project did not exist when SARS hit Canada in 2003

Sports fishers protest Fraser River Chinook closures

Public Fishery Alliance wants hatchery fish open for harvest

Amber Alert for two Quebec girls cancelled after bodies found

Romy Carpentier, 6, Norah Carpentier, 11, and their father, Martin Carpentier, missing since Wednesday

B.C. man prepares to be first to receive double-hand transplant in Canada

After the surgery, transplant patients face a long recovery

Grocers appear before MPs to explain decision to cut pandemic pay

Executives from three of Canada’s largest grocery chains have defended their decision to end temporary wage increases

Bringing support to Indigenous students and communities, while fulfilling a dream

Mitacs is a nonprofit organization that operates research and training programs

Most Read